YorkshireLad
7 Sep '19
A sign opposite Topps Tiles on SC says major gas works to begin on 19th September for six months. Not sure what the plan is and how much of the road will be dug up. Expect traffic!
A sign opposite Topps Tiles on SC says major gas works to begin on 19th September for six months. Not sure what the plan is and how much of the road will be dug up. Expect traffic!
I assume it must be the same work being done down Crofton Park?
I came home early one morning and there was a spectacular fire at the junction with Kemble Road. I think it was a gas escape.
According to roadworks.org the SGN work by Kemble Road was due to be from 31st July to 13th September and isn’t expected to cause traffic delays but I don’t recall seeing anything near there in the last few weeks. There’s no other gas works shown around that area covering that length of work either!