Archived on 6/5/2022

Southern Railways summer timetable from Sunday 16th May 2021

ChrisR
5 May '21

With the start of their summer timetable on May 16th Southern Railways are reinstating some of their weekday services that have not been running for much of the last 14 months.

The good news for us is that the London Bridge - London Victoria service is being reintroduced for the morning and evening peak times Monday - Friday and all day on Saturdays (when Southern lines into Victoria aren’t closed for the major engineering work taking place on many weekends and bank holidays over the next year or so!).

The additional services are as follows:

MONDAYS - FRIDAYS (From May 17th)

Forest Hill - Victoria
12 and 42 minutes past each hour from 0642 to 0842 and from 1742 to 1842 and then 2312
Victoria - Forest Hill
20 and 50 minutes past each hour from 0650 to 0820 and from 1620 to 1850

Forest Hill - London Bridge
28 and 58 minutes past each hour from 0558 to 0858 and from 1658 to 1928
London Bridge - Forest Hill
28 and 58 minutes past each hour from 0628 to 0928 and from 1728 to 1958 and 2258 to 2358

**SATURDAYS ** (except when lines into Victoria closed for engineering work so not before 5th June)

Forest Hill - Victoria
12 and 42 minutes past each hour from 0642 to 2342
Victoria - Forest Hill
20 and 50 minutes past each hour from 0650 to 2320 and then 2356

Forest Hill - London Bridge
28 and 58 minutes past each hour from 0558 to 2328 then 0001 and 0035
London Bridge - Forest Hill
28 and 58 minutes past each hour from 0628 to 2358

The full timetable from May 15th for all Southern services to and from Forest Hill/Honor Oak Park can be viewed and downloaded at: https://timetables.southernrailway.com/SN/#/timetables/374/Table%20G

N.B. When travelling late at night, weekends or bank holidays please check National Rail website closer to departure date in case of any changes due to engineering work.

SweetPotato
5 May '21

This is great news. Thanks for sharing.

maxrocks
5 May '21

at last! great news !!!