Been going up and down it for the past few days both on bike and in car, and have to say, it is one of the worst, most patchy, uneven “resurfacing” jobs I have seen in years.
In fairness Brockley Rise was never a good canvas to start with, but as they near the Chandos, I am left wondering if they will repair the underlaying issues at the bus stop opposite Duncombe Hill, i.e the road sinking.
Further back down by Rickmans Pharmacy, the work around the drain covers is also a bit lacking, with drops into them, rather than nearer flush.
I wonder now if they will carry on along the B218, past Honor Oak Road, and finally sort out the ever deteriorating surface down by St Hilda’s.
I will have to find out if there are different standards of finish when resurfacing road. When Church Rise was done recently, it was done with a much better finish. Will have to see how long the surface on Brockley Rise lasts now.